The Objective
Detailing the cost-to-integrity ratio found in iteration #154 of the bridge simulation.
Technical Logic
The goal was to stay under the $275,348 budget while maintaining safety factors. Using the relationship: $tan(9\theta) = \frac{sin(x)}{cos(x)}$
I was able to simplify the force distribution on the central nodes.