Skip to content
Rudy Galan
Go back

Lab Note: Truss Bridge Iteration #154

Edit page

The Objective

Detailing the cost-to-integrity ratio found in iteration #154 of the bridge simulation.

Technical Logic

The goal was to stay under the $275,348 budget while maintaining safety factors. Using the relationship: $tan(9\theta) = \frac{sin(x)}{cos(x)}$

I was able to simplify the force distribution on the central nodes.


Edit page
Share this post on:

Previous Post
Financial Architecture: 2026 Portfolio & Market Thesis
Next Post
How to configure AstroPaper theme